Skip Navigation Links MANUFACTURING > Welding
Welding

From welding of carbon steel to exotic materials, welding as per your specifications. The fabrication department occupies over 97,000 square feet of floor space.

PREPARATIONWELDING PROCESSES
Water jet cutting: 8’ x 20’ tableFCAW GTAW SMAW
Cutting press: maximum 1" thickGMAW SAW
Forming press: maximum 500 tons
Forming rolls: maximum 1-1/4" thick

WELDINGCRANES
Submerged arc: maximum 240" x 240"50 tons
Positioners: maximum 12 tons
Last Update Date :7/23/2007

 

© Copyright GLV 2007 all rights reserved. Legal notice